Toowoomba Motorists Need to Be Aware of 39 Roadworks This Week

helping to get you there on time


Article heading image for Toowoomba Motorists Need to Be Aware of 39 Roadworks This Week

Here's what the roads look like for the ahead:

 

CENTRAL DISTRICT:

Mort Street (Jellicoe Street – Hogg Street), NEWTOWN: Traffic disruptions may occur during road works. Signage / traffic management measures will be in place, as required.

Griffiths Street, HARLAXTON: Traffic disruptions may occur during road works, as follows: 

  • Griffiths Street (Mort St – New England Hwy) is CLOSED to eastbound traffic until December 2018.
  • Griffiths Street (Goombungee Rd - Doyle St) will be CLOSED on Sunday 16th September 2018.

Access to Business will be maintained during operating hours. Signage / traffic management measures will be in place as required. Read more about this project here.

Alderley Street (Hoepper St – Hoey St), SOUTH TOOWOOMBA: Traffic disruptions may occur during road works. Signage / traffic management measures will be in place, as required.

Drayton Wellcamp Road (Carys Rd – Devine Rd), GLENVALE: Traffic disruptions may occur during road works. Signage / traffic management measures will be in place, as required.

Herries Street (Hume St - Kitchener St), EAST TOOWOOMBA: Traffic disruptions may occur during water main works. Signage / traffic management measures will be in place, as required.

Nass Road, CHARLTON: Nass Road will be reopened to all local traffic up to the last driveway. The remaining road will be closed due to ongoing construction work. Signage / traffic management measures will be in place, as required. Read more about this project here.

Acton Vale Stud Road (Toowoomba Cecil Plains Road – Wellcamp Westbrook Road), WELLCAMP: Acton Vale Stud Road will be CLOSED to through traffic for water main works. Through traffic is advised to seek alternate routes. Detours, signage & traffic management measures will be in place, as required.

Cronin Road (Meringandan Road to Barracks Road), HIGHFIELDS: This section of road will be CLOSED from 22nd August 2018 for approximately 10 weeks whilst road upgrade works are undertaken. Signage / traffic management measures will be in place as required.

Auchmah Road (Warrego Hwy – Blaxland Rd), BOWENVILLE: Traffic disruptions may occur during road works. Signage / traffic management measures will be in place as required.

Aubigny Road (Lorrimer St to Russell St), OAKEY: Traffic disruptions may occur during road works. Signage / traffic management measures will be in place as required.

Walsh Road (Toowoomba Cecil Plains Rd – Biddeston Southbrook Rd), BIDDESTON: Traffic disruptions may occur during maintenance grading operations. Signage / traffic management measures will be in place, as required.

Crighton Road (Biddeston Southbrook Rd – End), BIDDESTON: Traffic disruptions may occur during maintenance grading operations. Signage / traffic management measures will be in place, as required.

Clarke Road (Biddeston Southbrook Rd – End) , BIDDESTON: Traffic disruptions may occur g maintenance grading operations. Signage / traffic management measures will be in place as required.

Toowoomba Cecil Plains Road (Oakey Biddeston Rd - Brookstead Norwin Rd) BIDDESTON to NORWIN: Traffic disruptions and lane closures may occur during road works. Signage / traffic management measures will be in place as required.

McPherson Road (Toowoomba Cecil Plains Rd – Olsen Rd), NORWIN: Traffic disruptions may occur during maintenance grading operations. Signage / traffic management measures will be in place, as required.

Jondaryan Evanslea Road (Toowoomba Cecil Plains Rd – Jondaryan St Ruth Rd), JONDARYAN: Traffic disruptions may occur during pavement repairs. Signage / traffic management measures will be in place, as required.

 

SOUTHERN DISTRICT:

Tummaville Road (North Branch Bridge), TUMMAVILLE/KINCORA AREA: The North Branch Bridge on Tummaville Road has been CLOSED until further notice, due to the identification of structural issues during a post-incident inspection. A side-track for local traffic is in place (for dry weather only) and all other traffic is advised to seek an alternative route.

Tummaville Road, TUMMAVILLE/KINCORA AREA: Issues have been identified with the culvert near the intersection of Tummaville Road and Gunbower Road. Lane width and speed reduction is in place as required.

Pipeline Road, MT TYSON: Traffic disruptions may occur due to pavement maintenance works. Signage/traffic management measures will be in place as required.

Gap Road, PITTSWORTH: Gap Road has reopened to all traffic. Footpath works are continuing. Signage/traffic management measures will be in place as required. Read more about this project here.

Short Road, ATHOL: Short Road will be closed from mid-August to mid-September for construction work. Signage and detour will be in place.

Budgee Road, BUDGEE: Issues have been identified with the culvert near the intersection of Budgee Road and Steele Rudd Road. Lane width and speed reduction is in place as required.

Various Roads, MILLMERRAN AREA: Bitumen works will commence in various streets in Millmerran. Signage/traffic management measures will be in place as required.

Various roads, PITTSWORTH/LINTHORPE AREAS: Maintenance grading will take place on various roads within the Pittsworth and Linthorpe areas. Signage/traffic management measures will be in place as required.

Various roads, CLIFTON AREA: Maintenance grading will take place on various roads in the Clifton area to the TRC boundary. Signage/traffic management measures will be in place as required.

Various roads, BROOKSTEAD AREAS: Maintenance grading will take place on various roads. Signage/traffic management measures will be in place as required.

Various roads, MILLMERRAN AREA: Maintenance grading will take place on various roads. Signage/traffic management measures will be in place as required

Mann Silo Road, TUMMAVILLE/KINCORA AREA: Shoulder re-sheeting & grading will take place. Signage/traffic management measures will be in place as required.

Various Roads, CAMBOOYA & FELTON AREA: Reseal preparation works will occur on various roads. Signage/traffic management measures will be in place as required.

Felton Clifton Road, NOBBY: Traffic disruptions may occur due to pavement maintenance works. Signage/traffic management measures will be in place as required.

Various roads, CLIFTON/SPRING CREEK AREAS: Gravel road re-sheeting will take place on Iona Road, Muller Road and Hoey Road. Signage/traffic management measures will be in place as required.

 

NORTHERN DISTRICT:

Anduramba Range Road, ANDURAMBA: Closed.

Bluff Road, ANDURAMBA: Traffic disruptions may occur during re-sheeting works. Signage / traffic management measures will be in place as required.

Douglas - Plainby Road, DOUGLAS: Traffic disruptions may occur during re-sheeting works. Signage / traffic management measures will be in place as required.

Pierces Creek Road, EMU CREEK: Traffic disruptions may occur during road upgrade works. Signage / traffic management measures will be in place as required.

Various Locations, ANDURAMBA, COALBANK and GEHAM areas: Traffic disruptions may occur during maintenance grading works. Signage / traffic management measures will be in place as required.

Various Locations, BOWENVILLE and GOERIE-LITTLE PLAIN areas: Traffic disruptions may occur during maintenance grading works. Signage / traffic management measures will be in place as required.

Various Locations, GLENCOE areas: Traffic disruptions may occur during reseal preparation works. Signage / traffic management measures will be in place as required.

Various Locations, RAVENSBOURNE areas: Traffic disruptions may occur during reseal preparation works. Signage / traffic management measures will be in place as required.

 

All works are scheduled to be undertaken as advised, weather permitting. Council apologises for any inconvenience caused by these works.

16 September 2018




Listen Live!
Up Next